Project Engineer at TotalEnergies
Job Overview
Project Engineer at TotalEnergies
TotalEnergies
Dar es Salaam
Candidate Profile
- Bachelor of science degree in Engineering
- At least one (1) years experience in handling engineering duties
- Project Management skills
- Capable of autonomy (analysis, proactive, negotiation skills, decision making, communication)
- Strictly committed to health, safety, environment and quality
- Graduate Engineer (Registered with Engineers Registration Board (ERB).
- AutoCAD highly desirable.
- Excellent computer skills in Microsoft Suite.
Activities
HSEQ
- Respect of the Golden rules and all the HSE rules and standards of TOTAL by all the staff, contractors, customers…
- Application of Safety Management Systems: Depots (MAESTRO1 & MAESTRO Log), Transport (SMT / PATROM)
- Quality Control of products to be within Tanzania quality specifications as per TBS.
- Signing with contractors prevention plan and work permit before starting works
Integrity Management
- Prepare and follow projects to put in place all the needed invariants and safety critical barriers on site in the respect of the LTP and Budget
- Actively Participates in sites Technical Integrity reviews and Integrity Steering Committees
- Ensures the implementation of compensatory measures and correctives actions associated with degraded situations
Projects
- Responsible for Projects Management of depot and Terminals.
- Conducting all engineering operations according to TOTAL HSEQ and technical standards and norms.
- Prepare detailed bidding documents or `request for proposals` (RFP) for projects that are being managed by the affiliate directly.
- Make proposals of assets improvement for sites (equipment layout, BOQ, etc).
- Undertake and supervise projects on sites. Before commissioning of the project a management of change (MOC) training should be provided.
- Follow the INVARIANT on sites
- Install all the invariants on sites according to the LTP
- Conducting project to improve sites
- Budget control- projects are implemented within approved budget.
- Quality control- projects are implemented to the quality standard specified.
- Time control- projects are implemented within the specified time frame.
- Contractual project payments follow up with Finance Department.
- Present investment budget for sites and produce a monthly report
- Prepare detailed bidding documents or `request for proposals` (RFP) for projects that are being managed by the affiliate directly.
- Tender evaluations of the above-mentioned type of projects and favorable negotiations prior to commencement
Reporting - Communicate with site managers to exchange with them on projects and on their needs
- Prepare a weekly report of all the activity (maintenance and projects)
- Respect all the standards and recommendations of Total (technical, HSEQ…) and of the Tanzanian regulations in all the projects and works
- Ensure progress and completion of the project as per Deadline
- Prepare the investment budget for the next year and follow the actual budget
- Prepare all the tanks inspection and during them improve the equipment to Total standards
Context & Environment
- Working in a high risk area due to the nature of product being handled requires a high sense of commitment, consideration and evaluation of any operation to be carried out.
- Job Safety Analysis (JSA) is required for any job to be carried out safely and effective.
- Working Instructions and procedures work as guides to make the working environment favourable.
- Providing key interfaces with Maintenance, Supply, Procurement and Commercial services.
Close coordination with;
- Internally: EM, OM, supply team, Commercial Department, HSEQ, Customer Service Department, Finance and purchasing department, Logistics Manager, Depot Managers, Paris HO (AMO – Log).
- Externally: Contractors, Engineering Consultants, Government institutions such W&M, EWURA, TBS, etc.
Main challenges:
- Lack of reliable and specific contractors hence requiring thorough supervision on projects.
- Lack of respect to HSEQ in all aspects of operations e.g. contracted works if not supervised thoroughly.
- Neglecting set standard drawings and technical documentation by contractors
- Time and cost management pre and during project implementation.