Advert enquiry : ajirayako@gmail.com

Control Room Operators at Lafarge Tanzania (Mbeya Cement) – 2 Posts

Job Overview

Control Room Operators at Lafarge Tanzania (Mbeya Cement) - 2 Posts

Control Room Operators at Lafarge Tanzania (Mbeya Cement) – 2 Posts

Control Room Operators at Lafarge Tanzania (Mbeya Cement) – 2 Posts

Mbeya

Lafarge Tanzania (Mbeya Cement Company Limited)

Lafarge Tanzania (Mbeya Cement Company Limited) a subsidiary of Holcim Group

Control Room Operators (2)

Mbeya Cement Company Limited (Lafarge Tanzania) a subsidiary of Holcim Group with its headquarters in Switzerland with operations in Africa, Europe, Asia and America. Holcim is the leading global company in innovative and sustainable building & construction solutions.
Lafarge Tanzania is seeking to recruit highly motivated Control Room Operators, to be based in Mbeya Plant, in a permanent employment contract.

Position Reporting: Kiln Coach

Summary of Roles and Responsibilities

a) Control all major process lines within the cement manufacturing operation including equipment commissioning, starts- ups, shutdowns, and emergency condition management as per established SOP’s in order to meet production requirements;
b) Monitor continuously, all plant process lines using all available tools to ensure employee safety, stable equipment operation, equipment integrity within prescribe design limitations, operating targets, and environmental regulations;
c) Control product quality at all stages of the cement manufacturing process by having a clear understanding of the targets, and the levers that are used to control the targets, along with the appropriate decision making process based on the impact of each lever;
d) Coordinate plant resources to troubleshoot, inspect, and maintain plant equipment as required, to meet production demands and prevent failures;
e) Maintain awareness of the automation system control strategy and makes recommendations for continuous improvement;
f) Maintain awareness of plant operating costs considers costs regularly in the decision making process.

Qualification

Education: Diploma or Degree in engineering field preferable Mechanical, Electrical or Process. Possess at least one year working experience in a cement plant control room operation.

Technical Competencies /Additional skills:

Mathematical Skills: Ability to calculate figures and amounts such as interest, proportions, percentages, area, circumference, and volume Chemistry and Physics As per CECIL + Prerequisites.
Knowledge of Plant environmental regulations, safety rules and compliance including First Aid, Confined Space, Working at Height, Material hazard awareness system and LOTOTO.
An understanding of manufacturing theory including air and material flows and control strategies for all major process lines associated with cement manufacturing: Quarry, Raw Grinding, Pyro Processing, and Finish grinding operations.
Problem solving methods and tools (Root Cause Failure Analysis, Risk Analysis) Understanding of cause and effect relationships with other production tools.

How to Apply:

Applicants are invited to submit their Resumes and Cover letters via: mcc.recruitments@lafarge.com indicating the position applied for in the subject of the email.

Deadline for application is 21st December 2023

Apply for this job

 JOB SCAM ALERT Never Pay to Get a Job. Legitimate Companies don’t Ask for Money, Job Openings with requests for Payment or Fees Should be Treated with Extreme Caution. Ajira Yako is not responsible for monies paid to Scammers.

Search Job Here