Advert enquiry : [email protected]

CPP Job Vacancies Tanzania | July 2024

Job Overview

CPP Job Vacancies Tanzania | July 2024

CPP Job Vacancies Tanzania | July 2024

The East African Crude Oil Pipeline (EACOP) project is part of the Lake Albert Development Project, a 1,443-kilometer transnational long-distance pipeline development project that can transport crude oil from Uganda to Tanga Port on the east coast of Tanzania. 

The EACOP system is divided into three components, above ground installations(AGIs), pipelines and offshore storage terminals (MST). The above ground installation (AGI) consists of 6 pumping stations (PS-1 to PS-6) and 2 pressure reducing stations (PRS-1 and PRS-2) along the pipeline route. The pipeline consists of 1,443 kilometers of 24-inch continuous heated export pipelines, connecting the Kabaale hub pumping station (PS-1) in the Hoima region of Uganda and the Tanga region storage reservoir in Tanzania. The pipeline includes all intermediate valve chambers, electric heat tracing (EHT) systems, high voltage distribution (HV) and fiber optic (FO) cables and related equipment, as well as the EHT substation. 

Main Contractor China Petroleum Pipeline Engineering Company Ltd (CPP) irresponsible for the constructing 1,443km 24in oil export pipeline (PPL), 8 aboveground facilities (AGI), the main line block valves and trace heating station, 16 mainc amp and pipe yards (MCPY), with 4 in Uganda and 12 in Tanzania. 

CPP, We are currently looking for dynamic, and self-motivated workers  who want to move their careers forward.

CPP Job Vacancies Tanzania | July 2024: 

Apply for this job

 JOB SCAM ALERT Never Pay to Get a Job. Legitimate Companies don’t Ask for Money, Job Openings with requests for Payment or Fees Should be Treated with Extreme Caution. Ajira Yako is not responsible for monies paid to Scammers.

Search Job Here