Terms of Reference (ToR) for Tanzania 200 sqm Mosque,120sqm Classrooms  Construction and Borehole Drilling  Projects

Project Name : Ahlul Quran

Project N: umber : ECP26058

Location: KIGOMA-KIBIRIZI

Start Date : DECEMBER,2026

End Date : MAY,2027

  1. Project Overview 

This document outlines the Terms of Reference for the Masjid construction project,  which includes the design, development, and completion of a Masjid in accordance  with approved architectural and engineering plans, as specified by the Africa Relief and  Community Development (ARCD). The project will follow all relevant TO Country  construction codes and regulations, as well as internationally recognized standards  where applicable. 

  1. Objectives 

The objective of this ToR is to outline the requirements and expectations for contractors  interested in executing the Masjid and classrooms construction project and drilling  borehole. The contractor will be responsible for the procurement of materials, site  management, construction, and completion of the Masjid, including all architectural,  structural, and special features as detailed in the contract agreement. 

  1. Scope of Work 

The contractor is expected to: 

  1. General Scope 

o The works comprise a 200 sqm Masjid; a 120 sqm building with three  classrooms and an office; and an 80-metre borehole fitted with a 3-metre tower and a 5,000-litre storage tank. All works must follow the approved  architectural and structural drawings. 

o All works shall adhere to Tanzania construction codes and regulations. 

2. Foundation and Structural Works  

  • Excavation for foundations shall be to a 70cm depth specified in  the structural drawings, approved by the supervising engineer.
  • A blinding layer of concrete (10 cm thick) shall be laid before placing 4 reinforcement bars of 12mm and a beam of 25cmx20cm is made.
  • The same size beam is made after foundation wall is complete.
  • Reinforcement: Steel rods used must conform to BS 4449:2005 standards  (or equivalent).
  • Columns footing of 75cmx75cm is made at 30cm below the foundation trench reinforced with 12mm steel bars as specified. Column of 25cm is raised to the superstructure. 
  1. Flooring 

o Interior: Ceramic tiles of size 40 cm x 40 cm, minimum thickness 10 mm,  to be installed on a levelled and screeded concrete base. Tiles must be  slip-resistant and approved by the supervising engineer. 

o Exterior Veranda: Non-slip ceramic tiles to be installed, with the floor  raised 50 cm above natural ground level, incorporating appropriate  drainage systems. 

  1. Walls 

o Block walls to be constructed using standard 400mm x 200mm X 150mm  blocks (5inches), bonded with mortar of a cement-sand mix ratio of 1:3. 

o Walls to be rendered and finished with high-quality paint suitable for  humid climates. 

 5.Roofing 

 o External roof covering to use 0.45mm thick zinc sheets of “long-span,  self-locking” type. Roof pitch to be designed to accommodate heavy  rainfall. 

 o Roof trusses to be constructed using treated timbers. 

6.Doors and Windows 

 o Doors: Metal doors (Turkish design) of specified dimensions. All doors are  to be primed and painted with anti-corrosion coatings. 

 o Masjid Windows: Eight Aluminium-framed windows with burglar-proofing  and mosquito netting.  

 7.Ceiling 

o Internal ceiling to be constructed from gypsum boards ensuring a  smooth, painted finish. 

o Ceiling height to be 3.5m high. 

  1. Toilets 

o Construct 8 (eight) toilets (5 for the male and 3 for female) of sizes 1.5m x  1.2m each as per design. 

o Wudu area to be next to toilets. 

o Windows at 600mm x 600mm. 

o Ceiling height to be 2.5m high. 

o Install nonslip ceramic tiles. 

o Install 6 (six) squatting and 2(two) Sitting toilet(s) and taps in each of the (6) Six toilets. 

 9.External Works 

 o Paving blocks 100cm wide to surround the structure. 

 10.Special Features 

o Imam’s pulpit to have 3 steps above finish floor level (10cm thick 250cm  wide) 

o A fibreboard project billboard (1m x 0.7m) detailing project information to  be installed near the entrance. 

 11.Lighting 

o Installation of a lighting system to provide eco-friendly illumination for the  Masjid. 

Deliverables 

The key deliverables for the project include: 

  • Site preparation, including excavation, leveling, and foundation works.  • Construction of the superstructure (columns, walls, roofing). 
  • Installation of external and internal finishes (flooring, windows, doors,  roofing, and lighting system). 
  • Final inspection, warranty, and project handover with rectification of any  defects identified during the final inspection.

Project Timeline 

The project is expected to be completed within 4 months, with penalties imposed for  delays. A penalty of 1% of the contract value will be charged per week of delay beyond  the agreed project timeline. 

Contractor Responsibilities 

The contractor will be responsible for: 

  • Procurement of Materials: Ensuring all materials meet the specifications  outlined in the contract, including roofing materials (0.45mm zinc  sheets), ceramic tiles, steel reinforcements (BS 4449:2005), and  concrete.
  • Worker Safety: Providing appropriate safety gear for all workers (helmets,  gloves, boots) and ensuring compliance with Country labour laws,  including worker insurance and fair wages. 
  • Site Management: Ensuring the safety and security of the construction  site, including managing tools and materials to prevent theft, and  ensuring proper waste disposal. 
  • Compliance with Building Codes: Adhering to Country construction  codes and international standards (BS, ASTM) for all construction  activities. 
  • Reporting: Submitting photographic and video documentation at each  construction stage, with progress reports every two weeks, approved by  the supervising engineer. 
  • Completion: The contractor must complete the project in adherence to  the contract timeline, rectify any defects at no additional cost, and  submit for inspection and handover upon completion.

ARCD Responsibilities 

ARCD will: 

  • Funding: Provide funding for the project according to the agreed payment  schedule. 
  • Documentation: Supply the approved architectural and structural  drawings, technical specifications, and design templates. 
  • Supervision: Conduct site inspections to ensure compliance with project  specifications and approve milestone reports, including progress photos  and videos. 

Payment Terms 

Payments will be made according to the following milestones: 

  • Advance Payment: 40% upon signing, after submission of performance  guarantee. 
  • Roofing and Shell Completion: 40% after installation of roof structure,  roof sheets, windows and doors. 
  • Finishing Completion: 15% after all plastering, flooring, painting, and  external works are completed and approved. 
  • Final Quality Assurance: 5% after six months, following final inspection  and resolution of any reported defects. 

Performance and Penalties 

The contractor will face penalties for: 

  • Delays: 1% of the contract value per week beyond the agreed completion  date. 
  • Substandard Work: A penalty of 5% for non-compliance with  specifications or substandard materials or workmanship. 
  • Unauthorized Subcontracting: Immediate termination of the contract and  a penalty of 10% of the total contract value for any unauthorized  subcontracting.

Documentation Requirements 

Interested contractors must provide the following documentation for compliance and  evaluation: 

  • Registration Certificate: A valid, up-to-date registration certificate from  the relevant authorities in Country. 
  • Signed Code of Conduct: A signed copy of the ARCD Code of Conduct. 
  • Insurance: Proof of insurance for worker safety, public liability, and  materials. 
  • Performance Guarantee: A performance guarantee equivalent to 10% of  the contract value. 
  • Bank Account Information: A bank statement confirming the contractor’s  ability to manage funds securely. 
  • CEO National Identification Number Copy: A copy of the CEO’s valid  national identification document for record purposes. 

Submission Deadline 

Interested contractors must submit their proposals, including the required  documentation, no later than 10th December 2026. 

Contact Information 

For further inquiries or to submit proposals, please contact: 

Name: Omar Bhoki 

Title: ARCD Engineer. 

Phone: +255 693 921 717 

E-mail:[email protected]

Apply for this job

 JOB SCAM ALERT Never Pay to Get a Job. Legitimate Companies don’t Ask for Money, Job Openings with requests for Payment or Fees Should be Treated with Extreme Caution. Ajira Yako is not responsible for monies paid to Scammers.

Search Job Here

AJIRA YAKO Connecting Tanzania’s Talent with Tomorrow’s Opportunities — ajirayako.co.tz effortlessly bridges the gap between top job seekers and leading employers nationwide to make hiring faster, smarter, and easier