EACOP runs 1,443km from Kabaale, Hoima district in Uganda to the Chongoleani Peninsula near Tanga Port in Tanzania. 80% of the pipeline is in Tanzania. It is a buried thermally insulated 24″ pipeline along with six pumping stations (two in Uganda and four in Tanzania) ending at Tanga with a Terminal and Jetty. Here crude oil will be loaded onto tankers.